IMC · 2024 International Mechanical Code

§504.6 · Dryer vent terminations in SE Wisconsin must clear any opening into the building by no less than three feet AND any forced-air inlet by no less than ten feet; the local amendment does not relax the IMC clearance.

Local amendment on §504.6 for the IMC 2024 SE Wisconsin jurisdiction.

Plain-English explainer

The SE Wisconsin amendment to §504.6 keeps the IMC clearance — ≥3 ft to openings, ≥10 ft to a forced-air inlet — but is explicit that the local amendment does not relax the requirement. The drafter cites it for dryer-vent permits in Milwaukee, Waukesha, Kenosha, and Racine.

Why inspectors flag this

A SE Wisconsin inspector checking a dryer rough-in will read this rule on the draft to confirm the local authority still expects the IMC clearance with no softening.


As quoted in the code: See §504.6 amendment.

See all codes that cite this trade

Browse the full International Mechanical Code index for one place to read every section the drafter is allowed to quote. See all codes →

See pricing

See every code, every jurisdiction — without the binder.

Trussmark turns job-site photos and voice notes into code-cited permit drafts the inspector can verify on the spot. Pick the plan that fits your shop and we will size the rest with you. Already cited this code in IMC 2024 SE Wisconsin? Drop your email and we'll size the rest of the permit draft for you. See pricing →

See pricing