IMC · 2021 International Mechanical Code
§301.1 · Scope
Effective in IMC 2021 · IMC 2024 SE Wisconsin · IMC 2024 NW Indiana.
Plain-English explainer
Section 301.1 sets the scope of the International Mechanical Code: it covers heating, ventilation, cooling, refrigeration, and process cooling work in a building, and tells the inspector what the IMC does NOT cover — work that belongs to the building or fuel-gas code. Trade-specific permit packets cited as 'per IMC' are citing this section to establish that the rest of the document is in scope.
Why inspectors flag this
Inspectors look for this rule on the second line of every draft to confirm the project actually belongs in the IMC (and not in the fuel-gas or building code, where the wording and clearances are different).
As quoted in the code: The IMC applies to mechanical work in buildings, including heating, ventilation, cooling, refrigeration, and process cooling. Work outside its scope is governed by the building code or the fuel-gas code.
See all codes that cite this trade
Browse the full International Mechanical Code index for one place to read every section the drafter is allowed to quote. See all codes →
See pricing
See every code, every jurisdiction — without the binder.
Trussmark turns job-site photos and voice notes into code-cited permit drafts the inspector can verify on the spot. Pick the plan that fits your shop and we will size the rest with you. Already cited this code in IMC 2021? Drop your email and we'll size the rest of the permit draft for you. See pricing →
See pricing